Tuesday 18 November 2014

Well he had our Tender appointment on Monday, and i was very happy with the process.

The main changes changes we have made are:


  • 2 meter widening of garage with 2.4 meter clearance
  • 2590 high ceilings
  • 2340 high entry doors
  • Put a wall in lounge/dining to make it into a study
  • Feng Shui staircase
  • Finishing touches Promotional pack
  • Flooring promo pack
  • Alfresco
  • extended shower to ensuite
  • Kitchen reveal window
  • 2340 high Stacker doors to alfresco
  • 2700 x 1800 picture window in dining room to look out to future pool
  • zoned heating and cooling
  • put in the  discontinued FULLERTON style kitchen (L shape island bench)
These are the preliminary drawings for downstairs.


7 comments:

  1. Hi Johnny and Rachel,

    Was going through your blog and realized, we have some things in common. Although me and my wife and going with Forsyth 35.

    ReplyDelete
    Replies
    1. This comment has been removed by the author.

      Delete
    2. Hi Sudeep,
      It would also be nice to connect with you

      Delete
    3. Hi Sudeep,
      It would also be nice to connect with you

      Delete
    4. Hey Sandeep,
      It would also be nice to connect with you.

      Delete
  2. Hi Johnny and Rachel,
    Thanks for the detailed blog. We're getting the same built and our appointments are in next month. We're getting the flooring done after handover. Not sure if we should get skirting done before tiling.

    ReplyDelete
  3. Hi Johnny and Rachel,
    Thanks for the detailed blog. We're getting the same built and our appointments are in next month. We're getting the flooring done after handover. Not sure if we should get skirting done before tiling.

    ReplyDelete

Total Pageviews