The main changes changes we have made are:
- 2 meter widening of garage with 2.4 meter clearance
- 2590 high ceilings
- 2340 high entry doors
- Put a wall in lounge/dining to make it into a study
- Feng Shui staircase
- Finishing touches Promotional pack
- Flooring promo pack
- Alfresco
- extended shower to ensuite
- Kitchen reveal window
- 2340 high Stacker doors to alfresco
- 2700 x 1800 picture window in dining room to look out to future pool
- zoned heating and cooling
- put in the discontinued FULLERTON style kitchen (L shape island bench)
These are the preliminary drawings for downstairs.
Hi Johnny and Rachel,
ReplyDeleteWas going through your blog and realized, we have some things in common. Although me and my wife and going with Forsyth 35.
This comment has been removed by the author.
DeleteHi Sudeep,
DeleteIt would also be nice to connect with you
Hi Sudeep,
DeleteIt would also be nice to connect with you
Hey Sandeep,
DeleteIt would also be nice to connect with you.
Hi Johnny and Rachel,
ReplyDeleteThanks for the detailed blog. We're getting the same built and our appointments are in next month. We're getting the flooring done after handover. Not sure if we should get skirting done before tiling.
Hi Johnny and Rachel,
ReplyDeleteThanks for the detailed blog. We're getting the same built and our appointments are in next month. We're getting the flooring done after handover. Not sure if we should get skirting done before tiling.